At long last the prefab wall frames arrived on site late yesterday afternoon by semi trailer.
The outer walls were pulled from the stacks and laid out on the slab ready for erection next day.
Big day today, all the wall frames - external and internal,  have been stood up into place- preliminarily-with temporary bracing securing them for over Easter...with final the squaring off, and permanent securing to come just after Easter.

Great to see the build finally take some 3 dimensional shape.
Finally we can walk through and begin to see first hand what we've seen on paper for so long.

Shed toilet connected up into the sewage system. Great to have up and running so all the tradesman can use it and no need to hire a portable one.