Wednesday 18 April 2012

Roof trusses - day 3


Day 3 of erecting the roof trusses.

Slowly but surely the future roof shape is emerging.
Today we hired a crane for the larger, hard to manage main trusses, to lift them up into place.


One by one each trusses lifted into place.

  
 Looking  through the front entrance toward the main living area, another truss gets lowered.
 

 Inside the lounge/dining/kitchen big room, the roof line emerging.


 Glimpses of the future finished roof line

 


 Also great to see our Trend Double Glazed 'ThermAL' windows (composite aluminium outside and  UPVC inside) arrived on site today and were unloaded into our shed.
 Hard to believe there's 23 windows and sliding doors in that stack!



The composite windows we are using have Colourbond 'Dune' outside and inside is white UPVC.
 