Saturday 10 March 2012

Trenching for slab

Finally with the weather on the improve, the torrential rain has stopped.
We've been able to start preparation for the slab.

Picture below showing preliminary marking out for plumbing.


The trenching begins

 
Laying the pipes
 

Covering the pipes with screenings



Pipes covered in soil and ready for the concreter


Delivering the mesh, chairs and poly on site ready for set up