We've been able to start preparation for the slab.
Picture below showing preliminary marking out for plumbing.
The trenching begins
Laying the pipes
Covering the pipes with screenings
Pipes covered in soil and ready for the concreter
Delivering the mesh, chairs and poly on site ready for set up
No comments:
Post a Comment